hydropower station group
基本解釋
- [水利工程]水電廠群水電站群
英漢例句
- An optimal operation model for group function of hydropower station is set up based on the basic principle of decomposition-coordination for big system.
本文根據(jù)大系統(tǒng)分解協(xié)調(diào)方法的基本原理,建立了水電站群優(yōu)化調(diào)度模型。 - Using this model the optimum compensating dispatching in the cooperation of Three Gorges hydropower station with the hydropower station group within the Three Gorges power system is studied.
并應(yīng)用該模型對三峽電力系統(tǒng)水電站群與三峽電站聯(lián)合運行進行了優(yōu)化補償調(diào)度研究。 - The optimization model and application of long-term operation of reservoir group of hydropower station were established in according to the system engineering and the linear programming methods.
水電站水庫群長期運行優(yōu)化模型及其應(yīng)用,是根據(jù)系統(tǒng)工程的思想,應(yīng)用線性規(guī)劃的方法建立起來的。
雙語例句
詞組短語
- hydropower station group 's optimized dispatching 水電站群優(yōu)化調(diào)度
短語
專業(yè)釋義
- 水電廠群
- 水電站群