project implementation scheduling
基本解釋
- [管理學]項目建設進度表
英漢例句
- These are the theory and specific implementation of optimization the project organization model, scheduling, quality, risk and cost combinatorial controlling.
引入進度、質量、風險、成本聯(lián)合控制思路以及具體措施和方法。 - To reduce the risk of project implementation failure brought by unsuitable project schedule, temporal constraint network was applied to the research of project scheduling.
為了降低由進度安排不當導致項目實施失敗的風險,將時間約束網(wǎng)絡應用到項目實施進度計劃研究中。
雙語例句
專業(yè)釋義
- 項目建設進度表