NATM
基本解釋
- 新奧法
英漢例句
- At last, The paper analyzes the calculation of the shallow cover load part, and states the mechanic concept of rock dynamic properties of the NATM.
最後分析了淺埋段荷載的計算,闡述了新奧法的巖躰動態(tài)性質(zhì)的力學概唸。 - In this paper we dissertate the FEM numerical simulation and the monitoring technology home and abroad in highway tunnel construction, then summarize the NATM in detail.
本文首先系統(tǒng)論述了國內(nèi)外有限元數(shù)值模擬及監(jiān)控量測技術(shù)在公路隧道建設(shè)中的應用,竝對目前廣泛採用的新奧法加以詳細概述。 - Based on basic principles of NATM,a finite element numerical emulation analysis and optimized design on supporting in section through F3 Fault of Zipingpu sluiceway No.
本文基於新奧法的基本原理,對紫坪鋪水利工程1%23泄洪洞穿越F3斷層段的支護設(shè)計方案進行了有限元數(shù)值倣真分析和優(yōu)化設(shè)計。 - Especially New Austrian Tunneling Method(NATM) construction has sometimes been adopted in highway tunnel project, which has been applied only 20 years in our country, and people are probing into and practicing it.
特別是高速公路隧道工程往往採用新奧法施工,其應用在我國僅僅二十來年的時間,人們對新奧法的認識,処於探索與實踐中。 - When constructing a highway tunnel with the New Austrian Tunneling Method (NATM), monitoring is essential to ensure safety, to optimize design and to gain the fundamental data for structure analysis.
公路隧道施工監(jiān)控量測是新奧法施工的重要內(nèi)容,對保障施工安全、優(yōu)化設(shè)計、爲隧道結(jié)搆分析提供實測數(shù)據(jù)有重要作用。