pile after driving
基本解釋
- [土木建築工程]二次打樁
- [機(jī)械工程]二次打樁
英漢例句
- The problem of the soil consolidation after tube-pile driving was studied.
研究了黏彈性土中琯樁沉樁後的固結(jié)問題。 - After the interval stop the driving continues and that is called pile restart.
將停鎚後繼續(xù)進(jìn)行打樁施工稱爲(wèi)後繼打樁。 - Here the function mechanism and the technology process of grouting after pile driving technology are explained by engineering examples and the development prospect is pointed out.
本文通過工程實(shí)例闡述了樁底注漿的工作原理和工藝流程,指出了樁底注漿技術(shù)的發(fā)展前景。
雙語例句
專業(yè)釋義
- 二次打樁
- 二次打樁