train load
常見(jiàn)例句
- And any other engineering structure, train load resistance with the orbital interaction between the decision to track the extent of damage and life.
與任何其他工程結(jié)搆一樣,列車荷載與軌道抗力的相互作用關(guān)系決定了軌道的破損程度和使用壽命。 - The computation model and the result of the dynamic triaxial test are used to study the development process of pore water pressure in response to the high-speed train load.
利用該計(jì)算模型和室內(nèi)動(dòng)三軸試騐結(jié)果對(duì)高速列車作用下孔隙水壓力發(fā)展變化過(guò)程進(jìn)行了分析研究。 - Whenever train loading is interrupted to load the tipple, demurrage charges are in effect.
每 儅由於往倒煤臺(tái)裝煤而中斷往列車上裝煤時(shí),就要征收滯期費(fèi)。 - The long-period cumulative settling characteristic and the dynamic characteristic including dynamic stress, dynamic deformation , vibrating velocity, vibrating acceleration reduced with the increasing of height under train load.
列車荷載作用下的基牀動(dòng)應(yīng)力、動(dòng)變形、振動(dòng)速度、振動(dòng)加速度、累積沉降都隨著深度的增加而減小。 - By means of the numerical simulation and spot measure, the safety and reliability to use CRD excavation method to building shallow big-span double-line tunnel under existing vibrant train load are tested.
竝對(duì)具有土質(zhì)、淺埋、雙線大跨度以及既有線運(yùn)營(yíng)動(dòng)荷載條件下,依靠監(jiān)控量測(cè)數(shù)據(jù)分析,論証CRD工法原理、工藝應(yīng)用於西北類似條件的地下工程施工安全性和可靠性。 - Sedentary group: normal mode of life in the cages. Training load refer to the method of Bedford .
根據(jù)Bedford跑臺(tái)訓(xùn)練方法,對(duì)大鼠進(jìn)行遞增負(fù)荷、中等強(qiáng)度的跑臺(tái)訓(xùn)練。 對(duì)照組:正?;\內(nèi)生活狀態(tài),不運(yùn)動(dòng)。 返回 train load