boring tower
基本解釋
- 鑽塔;鑽架
英漢例句
- The boring tower is arranged on the unilateral cantilever survey platform.
鑽塔,設(shè)於單側(cè)懸臂勘探平臺(tái) 上;
ip.com - Owing to the change of operating condition and serious water bearing in crude oil, the top of atmospheric tower is corroded and boring.
因操作條件變化和原油帶水嚴(yán)重,造成常壓塔頂部塔壁腐蝕穿孔。 - The equipment, comprising the boring tower inside the working area cantilever side and the slurry pumps on the boat body, is arranged on the survey platform.
設(shè)備,設(shè)於勘探平臺(tái)上,包括位於工作區(qū)懸臂側(cè)內(nèi)的鑽機(jī)和位於船躰上的泥漿泵。
ip.com
雙語(yǔ)例句
專業(yè)釋義
- 鑽塔
- 鑽塔