boring tower
常見例句
- The boring tower is arranged on the unilateral cantilever survey platform.
鑽塔,設於單側(cè)懸臂勘探平臺 上;
ip.com - Owing to the change of operating condition and serious water bearing in crude oil, the top of atmospheric tower is corroded and boring.
因操作條件變化和原油帶水嚴重,造成常壓塔頂部塔壁腐蝕穿孔。 - The equipment, comprising the boring tower inside the working area cantilever side and the slurry pumps on the boat body, is arranged on the survey platform.
設備,設於勘探平臺上,包括位於工作區(qū)懸臂側(cè)內(nèi)的鑽機和位於船躰上的泥漿泵。
ip.com 返回 boring tower